VisualGantt
VisualGantt is a software tool able to support detailed scheduling for manufacturing industries, born from a partnership between IROI and Finsa
VisualGantt focuses on discrete production and it is based on a set of last generation scheduling algorithms capable of defining high performance detailed solutions for large size plans.
VisualGantt has been designed to provide human scheduling operators with an advanced graphical interface which highly simplifies the generation or update of detailed production plans, taking into account many different aspects as constraints on capacity and resource availability, machine setups, material availability, work centre personnel assignment and so on.
Download here the brochure of the product.
Here there are some screenshots of the product:




